Figure 9-18 Stress Relief Bar Screws; Figure 9-19 Power Cable Designations; Figure 9-20 Position Of The Neutral, Line, And Earth Ground Screws - Motorola 2.1 Networking Setup Manual

Motorola network hardware user manual
Table of Contents

Advertisement

Appendix A:
Figure 9-18
Strain Relief Bar Screws (2)
5.
Spread out the three wires, so that the Blue wire is on the right side, the Brown wire is on the left
hand side, and the Green wire is in the center.
Figure 9-19
6.
Loosen the Neutral, Line, and Earth Ground Screws.
Figure 9-20
Stress Relief Bar Screws
Power Cable Designations
Position of the Neutral, Line, and Earth Ground Screws
9-18
Brown
Wire is
Line
GREEN
Wire is
Ground
Blue Wire
is Neutral
Line
Screw
Ground
Screw
(behind
plate)
Neutral
Screw

Advertisement

Table of Contents
loading

This manual is also suitable for:

Motomesh duo 2.1

Table of Contents