Phenomena
No
.
3
Time can be
BCU does not transmit the
not
time synchronisation frame.
synchronised
The settling of the time
with IEC103
synchronisation source is set
communicati
to other than IEC.
on.
†Note: BCU: Bay control unit, RY: Relay IED
‡Note: The user should set "even" for the parity setting. Not allowed to set except "even".
Supposed causes
- 926 -
Check / Confirmation
Object†
Transmit the time synchronisation
BCU
frame.
Change the settling of time
synchronisation source to IEC.
RY
Centralized GRB200
(Soft: 030, 031, 032, 033, 034)
6F2S1931 (0.20)