GE LOGIQ E9 Service Manual page 541

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5573152-100, R
IRECTION
Table 8-161 4D MC Re-installation for Lambda PS
3.
Route the USB Cable through the slot
in the PS.
Firmly, but gently push on the 4D MC
Cover until it is seated in place
(connected) to the PS.
Make sure the USB Cable is still in the
correct position.
Re-install the three 4D MC Cover
screws.
4.
Put the Main PS into position so it will
be ready to be mounted.
Route the USB cable between the
Frame and the BEP.
. 2
EV
Steps
Chapter 8 Replacement procedures
LOGIQ E9 S
Corresponding Graphic
M
ERVICE
ANUAL
8 - 257

Advertisement

Table of Contents
loading

Table of Contents