NEC Univerge SV9100 Hardware Manual page 84

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 1.2
3 - 12
Figure 3-20 19" Expansion Chassis Interface Units
Expansion Chassis Interface Unit
for the Expansion Chassis
GPZ-BS11
Expansion Chassis Interface Unit
for the Controlling Chassis
GPZ-BS10
1.
2.
Ensure Controlling and Expansion chassis are powered
down.
Using the NEC provided CAT5 straight-through cable(s),
attach one end to each Expansion Chassis CN2 connector
on the GPZ-BS11 blade (see
Cabling on page
3-13). Attach the opposite end to the CN2,
CN3 or CN4 connector on the GPZ-BS10 of the Controlling
Chassis.
UNIVERGE SV9100
Figure 3-21 System Expansion
Installing the SV9100 Chassis

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents