Cisco ASR 1000 series Hardware Installation Manual page 277

Aggregation services routers
Table of Contents

Advertisement

Chapter 9
Cisco ASR 1002-F Router Overview and Installation
Follow these steps to attach the cable-management brackets to both sides of the Cisco ASR 1002-F
Router in the rack:
Align the cable-management bracket to the rack-mount bracket on one side of the Cisco ASR 1002-F
Step 1
Router. The cable-management bracket aligns to the top hole of the chassis rack-mount bracket.
Insert one screw through the top screw hole of the cable-management bracket and into the chassis
Step 2
rack-mount bracket and tighten the screw using a Phillips screwdriver.
Figure 9-17
Figure 9-17
1
2
Insert one screw through the bottom screw hole of the cable-management bracket and into the chassis
Step 3
rack-mount bracket and tighten the screw using a Phillips screwdriver (see
Repeat Step 1 through Step 3 for the other side of the Cisco ASR 1002-F Router.
Step 4
This completes the procedure for installing the cable-management brackets on the Cisco ASR 1002-F
Router.
Attaching a Chassis Ground Connection
Connecting the Cisco ASR 1002-F chassis to ground is required for all DC-powered installations and
any AC-powered installation where compliance with Telcordia grounding requirements is necessary.
The grounding lug must be installed, all cards or filler plates must be fully inserted, screwed in, and
Caution
grounded to prevent a potential hazard in a telecom line.
OL-13208-11
shows where to attach the cable-management brackets to the Cisco ASR 1002-F Router.
Attaching the Cable-Management Brackets to the Cisco ASR 1002-F Router
3
1
Cable-management bracket top screw hole
and bottom screw hole
Cable-management bracket "U" feature
Cisco ASR 1000 Series Aggregation Services Routers Hardware Installation Guide
0
3
Chassis front rack-mount bracket
— —
Attaching a Chassis Ground Connection
S
C3 -PO
SP A-4 XO
2
Figure
9-17).
9-23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asr 1000 series

Table of Contents