Honeywell HWB2052W Series Owner's Manual page 9

Table top water cooler
Table of Contents

Advertisement

7. INSTALLING YOUR WATER COOLER FOR THE FIRST TIME
1. Ensure the unit is unplugged.
2. Fill water reservoir with tap water full to capacity.
Allow the water to settle into the hot and cold water
tanks for 5 minutes. (Fig. 1)
3. Push each water lever (hot and cold temperature) to
ensure water is running through the unit. (Fig. 2)
4. Plug the dispenser unit into the electrical outlet. Please
review the IMPORTANT SAFETY INSTRUCTIONS and
INSTALLATION GUIDELINES before doing so.
5. Turn ON the hot water switch, wait a couple of minutes
and turn ON the cold water switch. Allow the unit to
reach the minimum cold and hot water temperatures.
This will take approximately 45 minutes and the
indicator lights will turn OFF. (Fig. 3)
6. Test the water temperatures by pushing once again on
the water levers.
7. Turn OFF both hot and cold water switches and unplug
the unit from the electrical outlet.
8. Proceed to drain the water from the faucets one at
a time by pushing on the hot and cold levers until no
more water remains.
9. Move the unit towards the edge of a table or counter
top until the drain cap is exposed from below. Please
make sure to have a water container or bucket
underneath (Fig. 4).
10. Remove the binding ring by squeezing the levers and
sliding it off the rubber cover. Remove the rubber
cover from the drain pipe to drain the water from the
tanks.
11. Close the drain pipe with the rubber cover and slide
the binding ring into place.
12. Your unit is ready to be used. Please proceed with the
water bottle loading instructions.
5 MIN
Fig.1
Fig.2
Fig.3
Fig.4
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hwb2052s seriesHwb2052b series

Table of Contents