5. Reconnect to the system console with the start /SP/console command.
-> start /SP/console
Are you sure you want to start /SP/console (y/n)? y
Serial console started.
The systems displays various messages, followed by the ok prompt.
Related Information
"Verifying System Functionality" on page 65
■
SPARC Enterprise T5120 and T5220 Servers Administration Guide
■
Verifying System Functionality
After powering on the system for the first time, you can use the Sun Validation Test
Suite (Sun VTS) software to verify the functionality and performance of any installed
components, as well as its network connections.
Related Information
SunVTS documentation
■
To stop, type #.
Powering On the System
65