Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Properly grounded branch circuit.
REMOVE THE PACKAGING
the top of the hood. Two are located at the bottom of the
be removed. It is secured with two screws. All screw im
pressions are Phillips.
Top Of Hood
Remove Bottom Shipping
Shipping Board
Screws and Shipping Bracket
Junction
Top Shipping Screws
Box
7