Concluding Steps; Removing A Bbu; Preliminary Steps - Fujitsu PRIMERGY RX100 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX100 S8:
Table of Contents

Advertisement

9.5.2.7

Concluding steps

"Reassembling" on page 52
Ê
"Connecting the server to the mains" on page 55
Ê
"Updating RAID controller firmware" on page 74
Ê
"Enabling SVOM boot watchdog functionality" on page 78
Ê
"Switching on the server" on page 57
Ê
9.5.3

Removing a BBU

Upgrade and Repair Unit
(URU)
Tools: tool-less
9.5.3.1

Preliminary steps

"Shutting down the server" on page 45
Ê
"Disconnecting the server from the mains" on page 46
Ê
"Getting access to the component" on page 47
Ê
RX100 S8
Upgrade and Maintenance Manual
Expansion cards and backup units
Hardware: 15 minutes