How To Clear Passwords - NEC Bull NovaScale R620 User Manual

Hide thumbs Also See for Bull NovaScale R620:
Table of Contents

Advertisement

HOW TO CLEAR PASSWORDS

Power off the NovaScale/ft Server series and unplug the both power cords.
1.
Remove both CPU/IO modules (#1 and #2) from the NovaScale/ft Server series (see "Removing CPU/IO
2.
Module" in chapter 8).
Make setting of jumper switch for clearing the password of CPU/IO module # 0...
3.
Remove the clips from the jumper pins 11-12 on CPU/IO module # 0 and place them on the jumper pins 3-4
on the CPU/IO Module #1.
Install the CPU/IO Module # 0 to the NovaScale/ft Server series (see "Installing CPU/IO Module" in chapter
4.
8).
Connect the power cord of CPU/IO module #0 only, and then press the POWER switch to power on.
5.
When you see "8151: Password Cleared By Jumper" and "Press <F1> to resume, <F2> to Setup" during
6.
POST after the start-up, press the POWER switch to power off, and then disconnect the power cord from the
outlet.
Example
-------------------------------------------------------------------------------------------------
Phoenix ServerBIOS 3 Release 6.0
Copyright 1985-2003 Phoenix Technologies Ltd.
All Rights Reserved
GPJ1. HA. XXXX. X. XXXXXXXXXX
IGPJ BIOS Release X. X
Build Time : XX/XX/XX XX : XX : XX
2x Intel (R) Xeon (R) CPU 3.60GHz
3072M System RAM Passed
2048K Cache SRAM Passed
System BIOS shadowed
Video BIOS shadowed
IPMI Base Board Management Controller was detected.
Device ID : XX Device Revision : XX
IPMI Version : X. X Firmware Revision : XX. XX
Self Test Result : XXXXH
SMBIOS Initialize. . . . . . . . . Passed
System Monitoring Check. Passed
ERROR
8151: NVRAM Cleared By Jumper
Press <F1> to resume, <F2> to Setup
--------------------------------------------------------------------------------------------------
By referring to "Removing CPU/IO Module" in chapter 8, remove the CPU/IO module #0 from the server.
7.
Reset the jumper switch setting.
8.
Remove the clips from the jumper pins 3-4 and place them on the jumper pins 11-12 on the CPU/IO Module #
0.
Clear password for the CPU/IO module #1 by following the steps 3 to 8.
9.
By referring to "Installing CPU/IO Module" in chapter 8, install both CPU/IO modules on the server.
10.
Connect both power cords.
11.
NovaScale R620 User Guide
4-35

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents