Cisco 2504 Getting Started Manual page 16

Wireless controller
Hide thumbs Also See for 2504:
Table of Contents

Advertisement

Installing the Controller
Figure 8
1
1
After the controller is mounted ion the wall, perform the following tasks to complete the installation:
Step 5
Step 6
For configuration instructions about using the CLI setup program, see the
and Power-On Self Test" section on page
Mounting the Controller in a Rack
To mount the 2504 controller in a 19-inch equipment rack, you can order an optional Optional Rack
Mount kit (AIR-CT2504-RMNT).
Warning
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions
to ensure that the system remains stable. The following guidelines are provided to ensure your safety:
• This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
• When mounting this unit in a partially filled rack, load the rack from the bottom to the
top with the heaviest component at the bottom of the rack.
• If the rack is provided with stabilizing devices, install the stabilizers before mounting
or servicing the unit in the rack. Statement 1006
Cisco 2500 Series Wireless Controller Getting Started Guide
16
Place the Controller on the Mounting Screws
2
Front panel (facing down)
Connecting the Controller Console Port
Securing the Power Adapter Cable
Connecting to the Network
2
2
Mounting screws
20.
"Running the Bootup Script

Advertisement

Table of Contents
loading

This manual is also suitable for:

2500 series

Table of Contents