Hitachi RET670 Commissioning Manual page 135

Table of Contents

Advertisement

1MRK 504 165-UEN Rev. K
4.
Change the magnitude and angle of three phase voltages to achieve the impedances at test
points P1, P2,...., P28.
5.
For test points P1 to P14, observe the operation value for the signal ZOUT and compare the
operation value with the set value.
6.
For test points P15 to P28, observe the operation value for the signal ZIN and compare the
operation value with the set value.
Testing the power swing detection logic ZMBURPSB
Preconditions
The following output signals shall be configured to binary outputs: ZOUT, measured impedance
within outer impedance boundary and ZIN, measured impedance within inner impedance boundary
and START, power swing detection.
1.
Set X1InFw, R1LIn, X1InRv, R1FInFw, R1FInRv, ArgLd, RLdOutFw, RLdOutRv, kLdRFw and
kLdRRv to values that are in accordance with the selectivity plan and the corresponding
operating characteristic is shown in Figure 40.
2.
Set OperationLdCh to On and set timers tP1, tP2, tW and tH to their default values.
3.
Enable the input signal REL1PH to detect the power swing in one of the three phases.
4.
The test points that are to be considered for the power swing detection are shown in Figure 40.
IEC18000100 V1 EN-US
Figure 40:
Where,
φ =
5.
Inject voltage in one of the three phases in accordance with the test point P1 by keeping
constant current in three phases throughout testing and maintaining rated voltage for the other
two phases.
Transformer protection RET670
Commissioning manual
X1OutFw
X1InFw
X1InRv
X1OutRv
Proposed test points to detect power swing conditions
-1
tan
(X1InFw/R1LIn)
© 2017 - 2022 Hitachi Energy. All rights reserved
ZL
X
P3
P2
RLdInRv
RLdInFw
RLdOutFw
RLdOutRv
Testing functionality by secondary injection
GUID-E19CFFAA-3853-4895-A149-32F6E78B2C69 v1
j
R
P1
IEC18000100-2-en.vsdx
Section 11