Honeywell E3Point E3DA User Manual page 11

Gas monitor standalone, network, & remote models
Table of Contents

Advertisement

1.800.561.8187
Installation
4.
To mount the monitor, refer to the table for appropriate hardware and drill
size. Use the enclosed mounting template to drill into the vertical surface
if required.
Mounting
Example
Surface
Part
QTY (2)
Drywall, Plaster,
McMaster-Carr
Wood Paneling
#97121A013
QTY (2)
McMaster-Carr
#97026A021
Block, Brick,
AND
Concrete
QTY (2)
McMaster-Carr
#91555A111
Electrical Box or
As recommended by the manufacturer of the box or
Duct
5.
Tighten the mounting bolts or screws to 8.7 in-lb (1 Nm) maximum.
6.
Remove the metal grounding plate before removing the knockouts.
7.
Remove one of the knockouts (depending on where cables will enter the
housing) and affix appropriate conduit.
8.
Run wiring through the conduit and the housing to the monitor, (See
wiring section).
9.
Reinstall the PCBA.
10. Install the sensor cartridge.
11. Complete wiring as shown in the
12. Close the cover and tighten the cover screws to 29.7 in-lb (3 Nm).
13. Restore power to the monitor.
6
www.
Drill
Description
Bit
Size
Rounded head Toggle Bolt
· 6-32
· 3" long
3/8"
· 1-1/2" wingspan toggle
· Pull Out Strength: 35 lbs
Metal Anchor for Block and Brick
· 1" long
· Pull out Strength: 60 lbs
AND
1/4"
Rounded Head Screw
·No. 6, 7 or 8 sheet metal or wood
screw
· 2" long
N/A
duct
Wiring
section.
E
Point Gas Monitor Technical Manual
3
information@itm.com
.com

Advertisement

Table of Contents
loading

Table of Contents