Earth Grounding Instructions - Honeywell RAE Systems RAEPoint User Manual

Multi-function wireless infrastructure component
Table of Contents

Advertisement

Jumper JP1
The jumper labeled JP1 has no effect on operation, so leave it in place, as shown:
IMPORTANT!
Once the system is operational, test the functionality of all connected relays.

Earth Grounding Instructions

External Earth Grounding
Fasten the crimped ground wire with hardware as illustrated below. The wire should have a
2
minimum cross-section area of 4mm
for its conductor.
Honeywell®RAEPoint | User Manual
26

Advertisement

Table of Contents
loading

Table of Contents