Honeywell HON 380 User And Maintenance Instructions page 32

Gas pressure regulator with controller
Table of Contents

Advertisement

Test configuration
Checking the system
for leaks
HON 380 gas pressure regulator with HON 673/674 controller
The test setup is as follows (schematic diagram, using the RE1 DN50 and
HON 673 as a reference):
The numbers have the following meaning:
No.
Meaning
1
Inlet chamber
2
Outlet chamber
Inlet stop valve armature
3
Outlet stop valve armature
4
Proceed as follows:
Step
Description
1
Slowly close the outlet stop valve armature.
2
Apply the test medium to all detachable pipe joints.
3
Observe the test medium on all detachable pipe joints for several minutes.
If ...
no foam or bubbles are formed
foam or bubbles are formed
Step
Description
4
Slowly close the inlet stop valve armature.
5
Depressurize the inlet chamber and the outlet chamber.
6
Seal the leaking pipe joints.
7
Repeat the leak test starting with step 1.
Transport and installation
then ...
 the system is leak-proof.
 the system may be put into operation.
 the affected pipe joint is leaking.
 the system may not be put into operation.
 Proceed with step 4.
32

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hon 673Hon 674

Table of Contents