Tuning Machines - Grizzly T23750 Instruction Manual

Table of Contents

Advertisement

7.
remove the saddle from the bridge, and apply
a thin coat of glue to the back of the bridge
and the unfinished area of the soundboard.
Note: Do not use too much glue or the excess
may require clean up that can adversely
affect the finish of the guitar.
8.
let the glue set until it is still tacky but clear.
9.
place and firmly hold the bridge in position
for two minutes by hand. this will secure it
temporarily before clamping it.
10. Using 2 flexible battens, clamp the bridge in
place overnight, as shown in figure 14.
Bridge
Battens
figure 14. gluing the bridge to the body.
11. remove the clamp setup. insert the saddle
on the bridge. do not glue it. the saddle and
bridge are now ready for string installation
(see figure 15).
figure 15. Bridge and saddle installed on the
soundboard.
Model T23750 (Mfg. Since 3/13)

Tuning Machines

Each tuning machine consists of the machine
head, a threaded bushing, and an m2.4 x 6 tap
screw.
To install the tuning machines:
1.
Using a 10mm wrench, remove the threaded
bushing from each tuning machine.
2.
slide each machine head through a hole in
the headstock and secure with an m2.4 x 6
tap screw (see figure 16).
headstock
Buttons
figure 16. Correct tuning machine position.
3.
re-thread the bushings (removed in Step 1)
onto the tuning machines on the front of the
headstock.
tap
screw
-11-

Advertisement

Table of Contents
loading

Table of Contents