Outline Of Operation; Others; Fusing Temperature Control - Sharp Z-21 Service Manual

Table of Contents

Advertisement

4-2. Outline of operation

Positions of the racks, the bracket guide, and the C bracket are
shown below:
Bracket guide position
Bracket guide
[When ready]
Bracket guide
[Move to the document scan start position]
[Document scan (feed) start]
[Document scan (feed) end]
Bracket guide
[Move to stop position]
Rack guide
Bracket guide
Bracket guide
Bracket guide
Bracket guide
– 14 –

5. Others

5-1. Fusing temperature control

1
When the power is turned on, the power relay is also turned on at
the same time. After 300ms, the heater lamp turns on (ready
state).
2
During copying, the fusing temperature is controlled to about
149°C.
3
After turning on the power or after completion of copying, if there
is no key input for 90 sec, the power supply to the heater lamp is
stopped. (Auto shut off function)
4
In the auto shut off mode, if any key input is made or a paper is
inserted (in the case of Z-21), the power relay is turned on to turn
on the heater lamp (ready state).
Power switch
Power realy
300ms
Heater lamp
1
When the heater lamp temperature rises above 180°C, a high
temperature trouble is displayed ("H3" lamp lights up (Z-26); all lamps
except for READY lamp light up (Z-21)), and power supply to the
heater is stopped.
2.3sec
300ms
2
3
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-26

Table of Contents