6-3-2
Assembling
[1]
[1]
[1]
[2]
1R026
[1]
Fig. 36
Fig. 37
[2]
Fig. 38
[2]
1R033
1
Connect the connector and the receptacle terminals
to Switch [1].
Connect the switch terminals (2 locations) so that the
white to B1 and the red to B2.
2
Connect Flag receptacles to Terminals [1] (2 pcs).
Connect Flag receptacles on the following color
lead wire ends to the tabs of Terminal [1].
orange (to + marked tab)
white (to AS marked tab)
blue (to – marked tab)
Connect the other Terminal [1] as follows:
red (to + marked tab)
yellow (to AS marked tab)
black (to – marked tab)
(Fig.
50)
3
Connect the connectors to Switch units [2] (2 pcs).
4
Press-fit Ball bearing 696ZZ [2] into Rotor [1] with
1R033 and 1R026.
18 / 32
Note
Note