Replacing The Supercap Module - Cisco UCS X210c M6 Installation And Service Note

Compute node
Table of Contents

Advertisement

Servicing a Compute Node

Replacing the SuperCap Module

b) Using a T8 screwdriver, insert and tighten the four screws, two on each side of the sever node.
What to do next
If you removed the drives from the front mezzanine module, reinstall them now. See
Installing a Drive, on
page
19.

Replacing the SuperCap Module

The SuperCap module (UCSB-MRAID-SC) is a battery bank which connects to the front mezzanine storage
module board and provides power to the RAID controller if facility power is interrupted. The front mezzanine
with the SuperCap module installed is UCSX-X10C-RAIDF.
Note
The SuperCap module is only needed when the MRAID Storage Controller module (UCSX-C10C-RAIDF)
is installed.
Cisco UCS X210c M6 Compute Node Installation and Service Note
27

Advertisement

Table of Contents
loading

Table of Contents