Defib sync
AC power

Power up

Configure

2000966-542D
Installation: Connections
The connector provides ECG analog output signals to user-supplied
equipment.
CAUTION
Equipment damage. Connect all peripheral equipment
before plugging the power cord into an AC outlet.
Otherwise, connectors may be damaged.
Use this connector to apply power to the patient monitor. The patient
monitor will be powered at all times when using AC power (there is no
AC power switch). The patient monitor is preset at the factory for a
specific line voltage. Before applying power, verify the patient monitor's
line voltage setting matches your power supply. If required, use a small
bladed screw driver to change the line voltage setting. Refer to the label
on the back of the unit for the voltage and current requirements.
115V
CAUTION
Verify the line voltage selector setting before plugging
the power cord into an AC outlet. The power supply may
be damaged if the power source applied is different from
the line voltage setting.
After making all connections, plug the power cord into an AC wall outlet.
When all cables are properly connected, press the Power button to turn
the patient monitor on. All front panel indicators will illuminate until
the power-up sequence is complete. After approximately 20 seconds you
should see a display on the screen.
Go to
"Configuration"
on page 4-1 to configure and set up the Dash
patient monitor for patient use.
Dash 3000/4000/5000
line voltage selector:
115V for a 100-120V power source
230V for a 220-240V power source
004B, 829A
3-7