GE LOGIQ V2 Basic Service Manual page 314

Hide thumbs Also See for LOGIQ V2:
Table of Contents

Advertisement

external I/O
connections, 3-16
F
facility needs, 2-12
desirable features, 2-15
DICOM network function, 2-19
DICOM setup requirements, 2-20
InSite requirements, 2-19
network setup requirements, 2-19
purchaser responsibilities, 2-13
recommended floor plan suggestion, 2-17
required facility needs, 2-14
suggested floor plan
scanner and EchoPAC in same room, 2-18
floor plan suggestion
recommended, 2-17
scanner and EchoPAC in same room, 2-18
functional checks, 10-13
mains cable inspection, 10-14
system checks, 10-13
G
GE Healthcare leakage current limits, 10-22
general console requirements, 2-3
generic procedure on probe leakage current, 10-29
grounding continuity, 10-25
H
hardware/software compatibility, 9-4
hardware-software
compatibility, 5-3
hot or cold
if the unit is very cold or hot, 2-3
how often should maintenance tasks be performed?,
10-6
human safety, 1-13
I
icons, 1-6
icons indicating a special procedure to be used, 1-9
if the unit is very cold or hot, 2-3
important precautions, i-2
InSite
network requirements, 2-19
installation
see "system setup", 3-1
installation warnings
see "setup warnings", 3-3
introduction (chapter 1), 1-1
L
legal notes, i-17
lighting, 2-5
Index-2
list of abbrevations, 9-3
loading software, 7-13
lockout/tagout (LOTO) requirements, 1-23
LOTO
lockout/tagout requirements, 1-23
M
mains cable inspection, 10-14
maintenance
physical inspection, 10-15
preliminary checks, 10-12
system maintenance, 10-12
maintenance task schedule, 10-6
manufacturer, 1-28
mass
with monitor and peripherals, 3-14
mechanical safety, 1-16
model designations, 1-6
models covered by this manual, 1-5
N
network setup requirements, 2-19
O
omission and errors, i-15
operational and storage temperature for probes, 2-11
P
packing materials
recycling information, 3-12
paperwork
after setup, 3-42
PDF files
display and print, 4-21
periodic maintenance inspection (PM), PM (periodic
maintenance inspection), 10-4
phone numbers
customer assistance, 1-28
physical dimensions, 3-14
physical inspection
at arrivel, 3-13
Power On, 3-17
precautions
certified electrical contractor statement, i-14
damage in transport, i-14
important precautions, i-2
service safety considerations, i-16
translation policy, i-2
prepeare for setup, 3-13
prerequisite
provided by customer, 7-13
probe
connect, 3-17
probe cleaning, 10-18
probe leakage current test, 10-28
LOGIQ V2/LOGIQ V1 – Basic Service Manual
5610739-100 English Rev.10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logiq v156612445661242

Table of Contents