Required Facility Needs - GE LOGIQ C9 Series Technical Publication

Hide thumbs Also See for LOGIQ C9 Series:
Table of Contents

Advertisement

Site Preparations

Required facility needs

NOTE:
2-14
GE requires a dedicated power and ground for the proper
operation of its Ultrasound equipment. This dedicated power
shall originate at the last distribution panel before the Ultrasound
system.
Sites with a mains power system with defined Neutral and Live:
The dedicated line shall consist of one phase, a neutral (not
shared with any other circuit), and a full size ground wire from
the distribution panel to the Ultrasound outlet.
Sites with a mains power system without a defined Neutral:
The dedicated line shall consist of one phase (two lines), not
shared with any other circuit, and a full size ground wire from the
distribution panel to the Ultrasound outlet.
LOGIQ C9 Series – Basic Service Manual
5482298-100 English Rev. 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

5489329548933054893315489332

Table of Contents