Download Print this page

Honeywell COMBISAFE ESCALIB Manual page 7

Site spiral stair tower with side exit

Advertisement

ASSEMBLING AND DISMANTLING FROM SCAFFOLDS
Example of an Escalib with 3 modules.
WARNING:
Check that the ground on which the staircase Escalib is to be erected is able to withstand the load.
WARNING:
Comply with the general rules for handling and stability.
1 - The base must be oriented ac-
cording to the height of the floor
which needs to be accesed.
Start the installation 8 cm away
from the wall to facilitate pivoting
of the guardrails at the access le-
vel.
Level the base
4 - Fitting the module to the other one.
Assembly of the 4 uprights with M24 screws.
Start bolting with the new module's first step
(corner A-D) and then continue clockwise.
7
WWW.COMBISAFE.COM
2 - Fitting and
bolting the
barrier gate
with M16x100
screws. The erec-
tion guardrail is
positioned horizontally.
Start with the top most module.
5 - Without untying the slings, repeat step 4 as many times
as necessary.
3 - Access inside
the module is
available for
attaching the
sling to the 2
lifting rings,
for putting the
guardrails in closed position
and putting the erection rails in
horizontal position.

Advertisement

loading