3.5.6
Cable Connection between CPU Blades
When providing multiple-unit configuration, the IP connection
between UNITs is required. The UNIT is connected to IP network via
the VoIPDB blade on the CPU blade. Refer to
Connection between CPU

Figure 5-55 Cable Connection between CPU Blades

3.5.7
Install 19" Chassis Grounding
From the factory, the SG, ETH and PBXG grounds are located inside
the chassis and are connected to the FG ground (frame ground) on
the back of the chassis.
Each chassis (CHS1U-US or CHS2U-US) in the system must be
grounded separately using the procedure listed below.
1.
Ensure each Chassis is powered down and unplugged.
UNIVERGE SV8100/SV8300
Figure 5-55 Cable
Blades.
Installing the SV8300 Chassis

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Univerge sv8300

Table of Contents