Cisco 7000 Series Hardware Installation And Maintenance page 95

Hide thumbs Also See for 7000 Series:
Table of Contents

Advertisement

General
Installation
Step
Step
Step
10
Step
This completes
chapter
Genera nstaUaton
The
router
should
When
chassis
The
air
Multiple
clearance
of the chassis
air into
Do
chassis
conditions
environment
When
adequate
connection
you do
If
top
Step
Step
Warning
designed
Cisco 7010
Hardware
3-6
Installation
When
are inserted
all
screws
the cable
this
if
management
Skip
step
router
the cable
is
secure
install
router
an enclosed
is installed
in
and
device
cables
installed
are
chapter
You
remove
the four chassis
can
However we
recommend
chassis
above
and below
the chassis
1/4-inch
screwdriver
flat-blade
Connect
the
cord
power
to
of the
cable
the
router
Snap
the port
the rack
installation
continue
the
installation
to
be
should
the area
in
already
be determined
if
not
already
the router
on
table
installing
and have
considered
the
following
does
not block
the chassis sides
location
Allow
inches
of clearance
at least
chassis can
be
installed
them
but do
not place
and
avoid
placing
the router
vents
inlet
on
not place
router
the floor Floors
the
fans
by
the
Excessive
interior
and component
failures
than
the floor
where
to install
deciding
any
clearance
maintenance
for
cables
or
equipment
mount
not
the router
in
Make
sure
the area
that
in
make
between
sure your path
On
the chassis
ensure
that
and
are tightened
the
cover
Never
or
to
tilt
attempt
lift
of the chassis
the weight
to
support
and Maintenance
use
1/4-inch
flat-blade
brackets
are
already
brackets
management
the rack
rack
that
ensure
Refer
Rack-Mounting
to
an
extra 1/2-inch
feet
to
gain
allow
that
at least
you
which
than
the height of
is
greater
the feet
remove
to
AC
the
below
input
receptacle
retention
around
the
up
clip
Proceed
Cable Management
the
to
Installing
where you
will
install
it
Site Requirements
refer
to
you have
ensure
that
top
planned
which
the
are
on
each
of the chassis
side
in
equipment
racks
with
only
side
Allow
two
by
side
at least
other devices
or
equipment
nearby
dust which
accumulate
dust inside
the chassis
raised platform
or sturdy
consider future
equipment
IPs
installing/replacing
rack
follow
these
to install
steps
which
the router
will
install
you
and
new
router
location
the
its
on
the processor
all
captive
screws
components
secure
are
the chassis with the handles
one
screwdriver
each
to
tighten
When
router
installed
the
end
IP
of the router
at the
If
door
close properly
will
after
Chassis
the
earlier
in
this
below
of
vertical
space
inches
of
clearance
or
vertical
feet
the
If
necessary
the IP end
the
slots
at
processor
connector
the cable
to
secure
Brackets
and
location
installation
your
in
Chapter
location
clean
safe
and
exhaust
for cooling
inlet
vents
more
of
vertical
an
inch
or
on
inches
of clearance
each
can
force heated
exhaust
that
would
drawn
be
into
can
cause
interior
overtemperature
cleaner
table
provides
maintenance
requirements
network
or making/adding
bench
the router on
or
of debris
and
dust
free
is
unobstructed
is
modules and on
the access
IPs These
the
handles
on
the
the
the
the
use
in
in
this
for
the
side
the
Allow
table
Also
not
are

Advertisement

Table of Contents
loading

This manual is also suitable for:

70107000

Table of Contents