Mounting Of The Inflation Device; Machine Positioning - Bosch TCE 4460 Original Instructions Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 24
3. Insert the bead breaking arm and centre the joint pin
with the cylinder rod, ensuring that the flat part of
the joint pin is facing the outside.
4. Insert the hinge-pin and put back in place the exter-
nal elastic ring.
5. Position the return spring on the appropriate tab.
6. Remount the adjusting bush.
4.2.6

Mounting of the inflation device

1. Connect the gauge support to the column with the 2
provided screws.
1
2
Robert Bosch GmbH
Initial commissioning | TCE 4460 | 31
2. Connect the air tubes to the rapid joints of the ma-
nometer, by inserting them in the appropriate holes:
the pipe coming from the front joint of the inflation
pedal (1) in the internal joint (nearer to the column),
the pipe coming from the rear joint of the inflation
pedal (2) in the external joint.
2
1
4.2.7

Machine positioning

1. Put back in place the side door.
2. Loosen the two screws that fix TCE 4460 to the
pallet.
en
|
1 695 105 428
2010-02-16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents