Attaching The Chassis Door - Cisco NCS 4000 Series Unpacking, Moving, And Securing Manual

Network convergence system
Hide thumbs Also See for NCS 4000 Series:
Table of Contents

Advertisement

Attaching the Chassis Door

Attaching the Chassis Door
If the front door was removed earlier, install it after the chassis is installed on the rack. For door
installation details, see the "Replacing the Front Door" section in the
System 4000 Series Hardware Installation
Unpacking Chassis Component Shipping Pallets
The remaining shipping boxes and pallets are now ready to be delivered from receiving/shipping dock
to the final location of the chassis.
Steps
To unpack the pallets, follow these steps:
If possible, move the pallets to the same location as the unpacked and secured chassis. If not possible,
Step 1
move the individual boxes containing the various components to the chassis location.
Unpack all primary pallet parts from the packaging, and set the parts carefully aside for installation.
Step 2
Note
Unpack all secondary pallet parts from packaging, and set the parts carefully aside for installation.
Step 3
Note
Unpack all power components from the packaging, and set the parts carefully aside on an electrostatic
Step 4
discharge (ESD)-immune surface for installation.
Unpack all cosmetic parts from the packaging and set the parts carefully aside.
Step 5
What to Do Next
You can now install any additional chassis components, line cards, route processor cards, and fabric
cards. See the
Cisco Network Convergence System 4000 Series Unpacking, Moving, and Securing Guide
4-16
Take appropriate precautions for the sensitive optical components that are shipped with the
chassis.
Do not unpack individual cards until you are ready to install the cards in the chassis.
Cisco Network Convergence System 4000 Series Hardware Installation
Guide.
Chapter 4
Securing the Chassis
Cisco Network Convergence
Guide.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncs 4016

Table of Contents