Download Print this page

Cisco ONS 15600 Installation Instructions Manual page 13

Install the bay and backplane connections
Hide thumbs Also See for ONS 15600:

Advertisement

Chapter 1
Install the Bay and Backplane Connections
NTP-E7 Perform the Bay Installation Acceptance Test
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
In
Table
Table 1-1
Description
NTP-E1 Unpack and Inspect the ONS 15600 Bay Assembly, page 1-4
NTP-E2 Install the Bay Assembly, page 1-5
NTP-E3 Open and Remove the Front Door, page 1-6
NTP-E104 Install Cable Routing Modules and Kick Plates, page 1-8
NTP-E4 Install the Bay Power and Ground, page 1-9
NTP-E5 Remove the Rear Cover, page 1-11
NTP-E6 Install Wires to Alarm, Timing, LAN, and Craft Pin Connections, page 1-11
NTP-E8 Replace the Rear Cover, page 1-12
Step 2
Complete the
Stop. You have completed this procedure.
78-17203-01
This procedure performs a bay installation acceptance test.
Voltmeter
NTP-E1 Unpack and Inspect the ONS 15600 Bay Assembly, page 1-4
NTP-E2 Install the Bay Assembly, page 1-5
NTP-E3 Open and Remove the Front Door, page 1-6
NTP-E4 Install the Bay Power and Ground, page 1-9
NTP-E5 Remove the Rear Cover, page 1-11
NTP-E6 Install Wires to Alarm, Timing, LAN, and Craft Pin Connections,
page 1-11
Required
Onsite
None
1-1, verify that each procedure was completed.
ONS 15600 Bay Installation Task Summary
"DLP-E15 Inspect the Bay Installation and Connections" task on page
NTP- E7 Perform the Bay Installation Acceptance Test
Cisco ONS 15600 Procedure Guide, R7.0
Completed
16-22.
1-13

Advertisement

loading