mounting a single charger, but customers may choose to purchase rails from other suppliers as long as the rails meet
Honeywell specifications. Consider the following before wall mounting your charger.
Customer assembly required for the rail wall mount.
Customer assumes all responsibility for the installation of charger units.
Installer must verify that the installation meets all local building codes.
Avoid potential hazards (electrical wires, waterlines, and similar building components) when drilling into the wall.
Avoid blocking power outlets and other wall receptacles when installing the rail and charger.
Anchoring a wall mount rail to a wall stud generally results in a more stable installation. If you drill into a wall
stud, do not use a screw anchor in that hole.
If you are mounting two chargers side by side, you must leave at least 1 in. (2.54 cm.) of space between the two
units to allow clearance for the locking arms.
Rails must be anchored to the wall at least 12 in. (30.5 cm.) from the floor to allow for proper attachment, seating,
and removal of the charger unit.
If you are mounting a charger directly above another charger, Honeywell recommends clearance of at least 10 in.
(25.4 cm.) between DIN rails.
Part Number in Diagram
1
2
3
4
5

Mounting the A700 Device or Battery Charger

You will need:
DIN rail, slotted steel 35 mm X 15 mm, Honeywell Part #CM-1000-20-101 or customer-supplied DIN rail
meeting the following specifications
Figure 152: A700 charger - back view
Description
power supply
rubber stop for leveling charger against wall
locking arm for securing charger to DIN rail
mounting hook for hanging charger on DIN rail
USB port for charger software upgrades (only on battery
charger)