Samsung OfficeServ 7400 Technical Manual page 124

Hide thumbs Also See for OfficeServ 7400:
Table of Contents

Advertisement

OfficeServ 7400
TECHNICAL MANUAL
2. Remove the cradle of the phone by
pressing the [Push] mark on the top of
the cradle to push it out
3. Use screw holes 1 and 2 to attach the
base wedge to a standard electrical
outlet box.
64 BUTTON MODULES
Using one pair twisted #24 AWG or #26 AWG jumper wire, cross-connect each 64 Button
Module (64 BM) to the DLI port or plug into the KDB-DLI of your choice
installation
section). The 64 BM can be assigned to any keyset telephone. It must be assigned
to that station in MMC 209.
TDM 64 Button AOM
IP 64 Button AOM
CAUTION: To reduce the risk of fire, use only #26 AWG or larger telecommunication line
cord.
MAXIMUM AOM CAPACITIES
Maximum per Station
4
4
7.20
Home Page
Home Page
Table of Contents
Table of Contents
INSTALLATION
PART 7 MAY 2010
(see part 7.1.8 of this
Maximum per System
Limited by available DLI ports
Limited by available
IP/Virtual Ports

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents