Installing The 9.5" Gateway (Chs2Ug Gw-Us) And Base; Figure 3-26 9.5" Chassis (Front View) - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

3.4
3-22

Installing the 9.5" Gateway (CHS2UG GW-US) and Base

(CHS2UG B-US) Chassis
The CHS2UG GW-US and the CHS2UG B-US chassis have three universal blade
slots for station, trunk and optional blades.
Before proceeding with installation of chassis, ensure site preparation is
completed. The Gateway (CHS2UG GW-US) chassis can be:
Wall-mounted – refer to
and Base (CHS2UG B-US) Chassis on page
Stand-mounted – refer to
page
3-78.
The Base (CHS2UG B-US) chassis can be:
Wall-mounted – refer to
and Base (CHS2UG B-US) Chassis on page
Stand-mounted refer to
page
3-78.
From the factory, the SG, ETH and PBXG grounds are located inside the chassis
and are connected to the FG (frame ground) on the back of the chassis.

Figure 3-26 9.5" Chassis (Front View)

Power Switch
and LED
4.2 Wall Mounting the 9.5" Gateway (CHS2UG GW-US)
3-46.
6.2 Stand Mounting the 9.5" CHS2UG B Chassis on
4.2 Wall Mounting the 9.5" Gateway (CHS2UG GW-US)
3-46.
6.2 Stand Mounting the 9.5" CHS2UG B Chassis on
Issue 3.0
3 Universal Slots
(Slot 1 for CPU)
Installing the SV9100 Chassis

Advertisement

Table of Contents
loading

Table of Contents