Honeywell VE4000 Series Instruction Sheet page 6

Class a gas valves
Table of Contents

Advertisement

Instructions Electrical connections
Connection instructions with PG gland
On each side of the connection box there are break out
area's. See Fig 1. After removing the central part of one of
these break outs, the PG gland (supplied with the valve) can
be fitted.
Fig 1
After removing the nut from the gland, the gland can be
placed in the break out. The nut needs to turned onto the
gland inside the box and tightened as shown in Fig 2.
Specified torque for the nut: 4 Nm. Mounted PG gland
shown in Fig 3. Specified torque PG gland: 3 Nm.
Fig 2
Fig 3
After connecting wires ( L, N & PE) to dedicated connectors
on connector block, the connection needs to closed by
mounting the front cover. Before placing the cover, please
check the correct position of seal as shown in Fig 4. The
cover can only be mounted in one orientation. This is shown
in Fig 5.
Specified torque for cover screw: 0.5 Nm.
Specified cable diameter for gland: 7 – 13 mm.
Fig 4
Fig 5
Connection instructions DIN plug
Specified torque for DIN connector screw: 0.2 Nm.
Fig 6
6
Honeywell
ISTR0018 1602RA-NE

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ve5000 seriesVe4010Ve6010Ve8010Ve4015Ve6015 ... Show all

Table of Contents