A
23/Jul/2018
First issue drawing / Final study based on MRI-
REV
DATE
C1 - 01 - Cover Sheet
C2 - 02 - Disclaimer - Site Readiness
A1 - 03 -
General Notes
A2 - 04 - Equipment Layout
A3 - 05 - Section Views
A4 - 06 - Acoustic - Proximity Limits
A5 - 07 - RF Shielding
A6 - 08 - Equipment Dimensions (1)
A7 - 09 - Equipment Dimensions (2)
A8 - 10 - Delivery
S1 - 11 - Structural Notes
S2 - 12 - Structural Layout
A mandatory component of this drawing set is the GE Healthcare Pre Installation manual. Failure to reference the Pre Installation manual will result in
incomplete documentation required for site design and preparation.
Pre Installation documents for GE Healthcare products can be accessed on the web at:
GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete
set of final issue drawing. GE cannot accept responsibility for any damage due to the partial use of GE final issue drawings, however caused. All
dimensions are in millimeters unless otherwise specified. Do not scale from printed pdf files. GE accepts no responsibility or liability for defective work
due to scaling from these drawings.

MODIFICATIONS

S3 - 13 - Structural Details
M1 - 14 - Mechanical Layout
M2 - 15 - HVAC - Venting
M3 - 16 - Chilled Water
M4 - 17 - Cryogenics (1)
M5 - 18 - Cryogenics (2)
E1 - 19 - Electrical Notes
E2 - 20 - Electrical Layout
E3 - 21 - Electrical Elevation
E4 - 22 - Electrical Details
E5 - 23 - Power Requirements
E6 - 24 - Interconnections
www.gehealthcare.com/siteplanning
GE Healthcare
SIGNA PIONEER
FINAL STUDY
Drawn by
Verified by
Concession
PMM
PMM
Format
Scale
File Name
A3
1/4"=1'-0"
EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG
Typical
----
----
----
----
----
S.O. (GON)
PIM Manual
-
----
5680003-1EN
Date
23/Jul/2018
Rev
3
Sheet
01
/24

Advertisement

Table of Contents
loading

Summary of Contents for GE SIGNA PIONEER

  • Page 1 Pre Installation documents for GE Healthcare products can be accessed on the web at: www.gehealthcare.com/siteplanning GE does not take responsibility for any damages resulting from changes on drawings made by others. Errors may occur by not referring to the complete Format...
  • Page 2 Dimensions apply to finished surfaces of the room. Ceiling support structure, if indicated on the GE drawing, is in the correct location and at the correct height according to the Actual configuration may differ from options presented in some typical views or tables.
  • Page 3 MRI SITE PLANNING REMINDERS Please refer to pre-installation checklist in pre-installation manual listed on the cover sheet for items critical to Any deviation from these drawings must be communicated in writing to and reviewed by your local GE image quality.
  • Page 4 Moving metal sensitivity line for CARS, MINIVANS, PICKUP GE Supplied Customer/contractor supplied and installed TRUCKS, AND AMBULANCES. GE Supplied/contractor installed Available from GE NOTE: Ferrrous objects must not move into or inside of the 200 Gauss 5 Gauss moving metal sensistivity line during scans.
  • Page 5 + 8'-9" MAGNET ROOM 200 G Note: Define RF shield's inset according to 100G provisions made by the RF Shield vendor. Warning! 5 Gauss line outside the Magnet room limits. Typical SIGNA PIONEER EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG Date 23/Jul/2018 A3 - Section Views...
  • Page 6 No Limit Digital Detectors The customer must provide detail defining ferrous material below the magnet to the Project Manager so the GE Healthcare MR Siting and Shielding team can review for compliance. STEEL MASS LIMITS TO MAGNET ISOCENTER (3x3 m [10x10 ft] AREA UNDER MAGNET)
  • Page 7 Finished wall MAGNET GEOMETRIC Equipment ISOCENTER room RF Shield FRONT OF MAGNET 1372 [54 in] Integrated System Cabinet and Integrated Cooling Cabinet must be covered on both sides for safety. SCALE 1:50 Typical SIGNA PIONEER EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG Date 23/Jul/2018 RF shielding...
  • Page 8 [40.5 in] Note: Center of gravity is approximate and includes the GE Healthcare supplied VibroAcoustic Dampening Kit, but does not include cryogens, gradient assembly, side mounted electronics, or enclosures. Enclosure dimensions are for reference only, NOT FOR SITE PLANNING USE.
  • Page 9 GLOBAL OPERATOR CABINET (GOC) TOP VIEW 335.5 [13.21 in] [15.79 in] [29.71 in] [27.56 in] [12.13 in] [7.64 in] Center of Gravity SCALE 1:10 SIDE VIEW FRONT VIEW Typical SIGNA PIONEER EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG Date 23/Jul/2018 A7 - Equipment Details (2)
  • Page 10 24/7 chilled water and 480v power for shield/cryo cooler GE must be able to move system components in or out with no need to uncrate or disassemble any of the components. The entire passageway must be cleared, adequately lighted and free from dust.
  • Page 11 For safety, all removable items within the magnet room such as faucet handles, drain covers, switch box cover plates, light fixture components, mounting screws, etc. Must be non-magnetic. If you have a specific question about material, bring it to the attention of your GE project manager of installations. Floor levelness refer to...
  • Page 12 ITEM DESCRIPTION (GE SUPPLIED / CONTRACTOR INSTALLED) Vibroacoustic dampening kit (see floor structural detail) Magnet curtain kit (CONTRACTOR SUPPLIED & INSTALLED) 9'-4" Patient table dock anchoring Structural wall backing for Main Disconnect Panel Structural wall backing for Magnet Rundown Unit...
  • Page 13 The RF shield vendor must perform a pull test on the anchor (equal to the clamping force). NOTE: This drawing is to be used only as a design intent document. refer to ge installation manual for tray install. actual tray installation may be site dependent.
  • Page 14 An emergency water cooling back-up supply is recommended for continuous cryogen compressor operation. if using an open loop back-up design, ensure a drain is provided. please refer to the pre-install manual for optional back-up coolant supply requirements LOCATED ELSEWHERE Typical SIGNA PIONEER EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG Date 23/Jul/2018 M1 - Mechanical Layout...
  • Page 15 1450 4947 1450 4947 1450 4947 Room Common Ground Stud Motorized Damper Room ceiling OPTIONS ON/OFF Manual MR Elastography (MRE) Equipment fan switches in parallel RF Filter MAGNET ROOM CONTROL ROOM Typical SIGNA PIONEER EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG Date 23/Jul/2018 M2 - HVAC-Venting...
  • Page 16 2.6 gpm INLET FLOW (4 l/min) (10 l/min) TEMP RISE flow) flow) HEAT DISSIPATION (kW) 7.2 kW 8.7 psi at 2.1 gpm flow PRESSURE DROP (60 kPa at 8 l/min flow) Typical SIGNA PIONEER EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG Date 23/Jul/2018 M3 - Chilled Water...
  • Page 17 [0.5 in] mesh [1 in Must be all same material and all welded Support system must withstand 11125 N (2500 lbs) GE ventglas must be installed in vertical section directly over magnet Mesh bird screen Additional pipe/tubing 38 [1.50 in]...
  • Page 18 The total pressure drop of the entire cryogenic vent system must be less than 20 psi (138 kPa). The calculation starts at the magnet vent interface and ends at the termination point outside the building. Typical SIGNA PIONEER EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG Date...
  • Page 19 10. The maximum point to point distances illustrated on this drawing must not be exceeded. 11. Physical connection of primary power to GE equipment is to be made by customers electrical contractor with CONNECTIVITY REQUIREMENTS the supervision of a GE representative.
  • Page 20 One 75mm [3"] cnd above ceiling Breaker Boxes ITEM QTY Outlet Legend for GE Equipment System emergency off (SEO), (recommended height 1.2m [48"] above floor) Door interlock switch (needed only if required by state/local codes) Emergency exhaust fan switch 1.2m [48"] height recommended)
  • Page 21 + TBD + TBD + TBD + TBD MAGNET ROOM CONTROL ROOM + 8'-9" + TBD + TBD + TBD EQUIPMENT ROOM + TBD Typical SIGNA PIONEER EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG Date 23/Jul/2018 E3 - Electrical Elevations...
  • Page 22 Minimum distance on either side of an obstruction: 254 mm [10 in], minimum distance from top of cable tray to Obstruction: 178 mm [7 in]. 9 - Minimum distance between trays: 12 mm [0.5 in]. 10 - Non-ferrous cable support center. Typical SIGNA PIONEER EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG Date 23/Jul/2018 E4 - Electrical Details...
  • Page 23: Power Requirements

    7 days per week. Run E3030 length of 1.5m [60in], and will be connected during installation. Runs E0009, E3030 and M3030 are GE supplied cables. Each conductor will be identified and isolated (screw connector). all other wiring is customer supplied and installed.
  • Page 24 7.31 Nominal Magnet Isocenter 10.06 Maximum Short Short Long ISC cabinet 15.24 Short Long Ethernet Hub in ISC 15.24 Short Long Long 60 Hz 6.09 Customer Supplied Outlet 50 Hz 7.62 Typical SIGNA PIONEER EN-MRI-TYP-SIGNA_PIONEER-WEB.DWG Date 23/Jul/2018 E6 - Interconnections...