Fault Clearing
The Storage Subsystem does not Power on with the
Attached Server
The PSU power switches must be set to ON.
Incorrect cabling
Ensure that the SAS cabling is correct (SAS IN port); the Storage
Subsystem is powered on by SAS link from the Server.
Cisco C880 M4 Storage Subsystem Operating Manual for Server with E7-8800 v3 CPU
Problem Solutions and Tips
43