AH-S22AW2
AH-S25AW2
6. Disconnect the connector. (4 places)
Disconnect the faston terminal. (11 places)
Remove the 3 screws of the control PWB, and the
control circuit will be ready for removal from the control
box.
7. Remove 2 fastening screws of the control box.
8. Remove the outdoor fan.
9. Remove 2 screws which fasten the motor angle.
Pull up the motor angle for removal.
(During reassembling, treat the lead wire to prevent it
from being in contact with the propeller fan.)
10. Remove 3 motor fastening screws, and remove the
motor.
11. Remove the bulk head.
Remove 2 fastening screws. Lifting the bulk head,
remove 2 inner hooks.
Bulkhead
12. Remove 4 screws which fasten the reactor on the
bulkhead, and remove the reactor.
Reactor
32
Reactor
Bulkhead