Siemens SINAMICS G120 Operating Instructions Manual page 108

Low voltage converters built-in and wall mounting units with cu230p-2 control units
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Installing
4.5 Connecting the interfaces for the inverter control
Operation with operator panel
To connect the operator panel to the Control
Unit, you have to plug in the supplied connect‐
ing cable to the Control Unit and the operator
panel.
Fasten the plug connector in the door with the
supplied clamp.
108
Converter with the CU230P-2 Control Units
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257946B AE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120p

Table of Contents