Uv Monitor - GE AKTA start Maintenance Manual

Hide thumbs Also See for AKTA start:
Table of Contents

Advertisement

3 Maintenance operations

3.5 UV Monitor

3.5

UV Monitor

Introduction
This section describes how to access the UV Monitor options, perform calibrations and
edit UV settings.
In this section
This section contains the following subsections:
Section
3.5.1 UV LED calibration
3.5.2 Diagnostics
3.5.3 Flow cell path length
3.5.4 Reset number of run hours
Access the UV Monitor options
Follow the instructions below to access the options for calibrating and troubleshooting
the UV Monitor.
Step
1
2
38
Action
Navigate to the Settings and service page containing the UV option (see
Navigate).
Tap UV to access the UV Monitor options.
Result: The UV screen opens.
ÄKTA start Maintenance Manual 29060308 AD
See page
39
41
44
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents