GE ApexPro Service Manual page 160

Telemetry server
Hide thumbs Also See for ApexPro:
Table of Contents

Advertisement

6-26
Parts Lists, Drawings and Replacement: Disassembly/Assembly
7.
Using an open-end wrench, remove the 2 nuts securing the SNMP battery
bracket to the chassis.
8.
Remove battery/bracket from the screws.
9.
Reverse the steps in this procedure to install the SNMP battery.
&$87,21
EQUIPMENT DAMAGE — Use extra care to make sure the pins
are properly aligned before seating the SNMP extension board.
Bent/broken pins may result if the pins are misaligned.
10. If applicable, perform the
ApexPro Telemetry Server
2001989-178
"Electrical Safety Tests"
on page 4-10.
186A
185A
Revision C

Advertisement

Table of Contents
loading

Table of Contents