5.2
Pre-operational Procedure
The following shows the procedures to be taken before operation.
Mount the CC-Link IE Controller Network module to the base unit.
Perform a unit test on the CC-Link IE Controller Network module.
Connect cables to the CC-Link IE Controller Network module.
Perform a communication test on the CC-Link IE Controller Network module.
Set network parameters for the CC-Link IE Controller Network module.
Perform the CC IE Control diagnostics.
Perform programming and/or debugging.
146
Preoperational procedure
Operation
Page 150, Section 5.4
Page 162, Section 5.5
Page 164, Section 5.6
Page 177, CHAPTER 6
Page 174, Section 5.7
Page 526, Section 10.3
Page 267, CHAPTER 8