Download Print this page

GE GBS2OKB Owner's Manual And Installation Instructions page 47

Icemaker accessory kit

Advertisement

Installation Instructions
[] INSTALL WATER LINE CLAMP
• Attach
the metal water line clamp (strain relief)
(8) to the refrigerator.
Drive the screw (7) from
the kit through
the clamp (8) at the indent into
the back of the cabinet.
• The metal clamp
is for the house
water line (see
the Water
Line Installation
Instructions).
It is not
to be used for the tubing
from the water valve up
to the icemaker.
[] CONNECT THE WATER LINE
• Make sure there
is enough
plastic water line to
extend
from the water valve to well into the
water tube inlet (15). Cut off any excess tubing.
• Squeeze the ends of the hose clamp (3) from the
kit with pliers and slide the clamp over the water
tube inlet.
• While still squeezing
the clamp, insert the plastic
water line into the inlet as far as it will go
(approximately
1" [25 mm]).
• Then slide the clamp downward
to capture
the
plastic water line in place.
• Make sure the fill tube is aimed
down.
Water tube
inlet
[] ROUTE AND ATTACH THE
PLASTIC WATER LINE
• Fasten the plastic water line to the back of the
cabinet with adhesive-backed fasteners (5),
spacing the fasteners as shown to take up slack
in the line.
Adhesi_-backed fasteners
for plasticwaterline
[] WATER VALVE INSTALLED
Refer to the Water Line Installation
Instructions
for
connection
to the home water supply. After water
line installation
is completed,
set the icemaker
power switch to I (on).
The icemaking cycle will not begin until the icemaker
and freezer compartment
reach operating temperature,
then icemaking will begin automatically.
41

Advertisement

loading