Toshiba A20-S259 - Satellite - Pentium 4 2.66 GHz Maintenance Manual page 436

Maintenance manual
Hide thumbs Also See for A20-S259 - Satellite - Pentium 4 2.66 GHz:
Table of Contents

Advertisement

4.30 Fluorescent Lamp
Attaching the cover bottom, screw, top case, control PCB and FPC
11. Attach the bottom cover and screw (1).
CAUTION: Pressure should not be given on the source TCP.
12. Attach the top case (2).
CAUTION: Pressure should not be given on the gate TCP.
13. Attach the control PCB (3).
CAUTION: Move the control PCB to the right.
14. Attach the FPC cable (4) used for the control PCB connecting.
CAUTION: Pressure or stress should not be given on the FPC cable.
Figure 4-174 Attaching the cover bottom, screw, top case, control PCB and FPC
Satellite A20 Maintenance Manual (960-444)
4 Replacement Procedures
4-217

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite a20 series

Table of Contents