156 Electrical installation – Global (IEC)
M5×25/35
Frame size
R6
R7
R8
R9
Detaching and reinstalling the connectors
This is possible but not recommended.
Terminals T1/U, T2/V and T3/W
•
Remove the nut that attaches the connector to its busbar.
•
Put the conductor under the connector pressure plate and pre-tighten the
conductor.
•
Put the connector back to its busbar. Start the nut, and turn it at least two
rotations by hand.
WARNING!
Before using tools, make sure that the nut/screw is not cross-threading.
Cross-threading will damage the drive and cause danger.
•
Tighten the nut to a torque of 30 N·m (22 lbf·ft).
•
Tighten the conductor(s) to 40 N·m (30 lbf·ft) for frame R8 or to 70 N·m
(52 lbf·ft) for frame R9.
Terminals L1, L2 and L3
•
Remove the combi screw that attaches the connector to its terminal post,
and pull the connector off.
•
Put the conductor under the connector pressure plate and pre-tighten the
conductor.
9b
9a
8
L1, L2, L3, T1/U, T2/V, T3/W
N·m
lbf·ft
30
22
40
30
40
30
70
52
10b
10a
8
PE,
N·m
lbf·ft
9.8
7.2
9.8
7.2
9.8
7.2
9.8
7.2
N·m
lbf·ft
1.2
0.9
1.2
0.9
1.2
0.9
1.2
0.9