Mitsubishi Electric MELSEC iQ-R Series Programming Manual page 138

Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

[Cd.409] Synchronous control reflection time (R: D42771+160n/Q: D15131+150n)
Set the reflection time for synchronous control change processing as follows.
[Cd.407] Synchronous control change
command (R: D42770+160n/Q: D15130+150n)
0: Cam reference position movement
1: Change cam axis current value per cycle
2: Change current value per cycle after main shaft gear
3: Change current value per cycle after auxiliary shaft
gear
4: Cam axis current value per cycle movement
6 SYNCHRONOUS CONTROL
136
6.6 Synchronous Control Change Function
Setting details for "[Cd.409] Synchronous control reflection time (R:
D42771+160n/Q: D15131+150n)"
The time to reflect the travel value to the cam reference position.
Setting not required.
The time to reflect the travel value to the cam axis current value per cycle.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec iq-r16mtcpuMelsec iq-r32mtcpuMelsec iq-r64mtcpu

Table of Contents