1MRK506371-UUS Rev. M
1.
Connect the signals above to binary inputs and binary outputs.
2.
Connect the voltage inputs to the analog inputs used for each bus or line depending of the type of
busbar arrangement and verify that correct output signals are generated.
Testing the voltage selection for double breaker
This test should verify that correct voltage is selected for the measurement in the SESRSYN function
used for a diameter in a Breaker-and-a-half arrangement. Apply a single-phase voltage of 100%
GblBaseSelLine to the V-Line and a single-phase voltage of 100% GblBaseSelBus to the V-Bus. Verify
that correct output signals are generated.
1.
Connect the analog signals to the voltage inputs, in pair of two for V1 and V2. (Inputs V3PB1,
V3PB2, V3PL1, V3PL2)
2.
Activate the binary signals according to the used alternative. Verify the measuring voltage on the
synchronizing check function SESRSYN (25). Normally it can be good to verify synchronizing check
with the same voltages and phase angles on both voltages. The voltages should be verified to be
available when selected and not available when another input is activated so connect only one
voltage transformer reference at each time.
3.
Record the voltage selection tests in a matrix table showing read values and AUTOSYOK/
MANSYOK signals to document the test performed.
Testing the voltage selection for 1 1/2 CB arrangements
At test of the SESRSYN (25) function for a breaker-and-a-half diameter the following alternative voltage
inputs can be used for the three SESRSYN (SESRSYN 1, SESRSYN 2, SESRSYN 3) functions. These
three SESRSYN functions can either be in one, two or three different IEDs. Table
scenario when SESRSYN 1, SESRSYN 2 and SESRSYN 3 all are in the same IED. If SESRSYN 3 is in
another IED, WA1 will be considered as WA2 and LINE2 as LINE1. The voltage is selected by activation
of different inputs in the voltage selection logic as shown in table
Table 40:
SESRSYN
SESRSYN 1
(Operates on CB1
52)
SESRSYN 2
(Operates on CB2
252)
Table continues on next page
Line distance protection REL670
Commissioning manual
Voltage selection logic
CBConfig
Section to
setting
be
synchronize
d
breaker-and-
Bus1 –
a-half bus
Line1
CB
Bus1 –
Line2
Bus1 – Bus2 CB2 252
Tie CB
Line1 –
Line2
Bus1 –
Line2
Bus2 –
Line1
Bus1 – Bus2 CB1 52
© 2017 - 2023 Hitachi Energy. All rights reserved
40
and figure 53.
Activated
Activated
Activated
B1QCLD
B2QCLD
LN1QCLD
input on IED
input on IED
input on IED
from
from
from
LN1 989
CB2 252
CB3 352
LN1 989
CB1 52
CB3 352
LN1 989
CB3 352
Section 11
Testing functionality by secondary injection
GUID-12E7DA63-FE04-4C83-9BA6-34818C510DB8 v4
40
describes the
Activated
Indication
LN2QCLD
from
input on IED
SESRSYN
from
on IED
B1SEL,
LN1SEL
LN2 989
B1SEL,
LN2SEL
B1SEL,
B2SEL
LN2 989
LN1SEL,
LN2SEL
LN2 989
B1SEL,
LN2SEL
B2SEL,
LN1SEL
B1SEL,
B2SEL
M2377-691 v6
209