4.
Change the magnitude and angle of three phase voltages to achieve the impedances at test points
P1, P2,...., P28.
5.
For test points P1 to P14, observe the operation value for the signal ZOUT and compare the
operation value with the set value.
6.
For test points P15 to P28, observe the operation value for the signal ZIN and compare the
operation value with the set value.
Testing the power swing detection logic ZMBURPSB (68)
Preconditions
Line distance protection REL670
Commissioning manual
R
0.8 * (R1FInFw + ∆Fw)
R1FInFw + ∆Fw
0.0
-(0.8 * R1LIn + R1FInRv +
∆Rv)
-0.8 * (R1FInRv + ∆Rv)
-RLdOutRv
-R1FInRv + ∆Rv
-0.8 * (R1FInRv + ∆Rv)
-(R1FInRv + ∆Rv)
Testing points to measure the inner boundary
R
0.0
0.8 * R1LIn + R1FInFw
0.8 * R1FInFw
RLdInFw
R1FInFw
0.8 * R1FInFw
R1FInFw
0.0
-0.8 * R1LIn + R1FInRv
-0.8 * R1FInRv
-RLdInRv
-R1FInRv
-0.8 * R1FInRv
-R1FInRv
© 2017 - 2023 Hitachi Energy. All rights reserved
Testing functionality by secondary injection
X
Comment
-0.8 * (R1FInFw + ∆Fw) *
tan (ArgLd)
-0.8 * X1OutRv
-X1OutRv
-0.8 * X1OutRv
-0.8 * (R1FInRv + ∆Rv) *
tan (ArgLd)
0.0
0.0
If OperationLdCh = Off
0.8 * (R1FInRv + ∆Rv) * tan
(ArgLd)
0.8 * X1OutFw
X
Comment
X1InFw
0.8 * X1InFw
(0.8 * R1FInFw + ∆Fw) *
tan (ArgLd)
0.0
0.0
If OperationLdCh = Off
-(0.8 * R1FInFw + ∆Fw) *
tan (ArgLd)
-0.8 * X1InRv
-X1InRv
-0.8 * X1InRv
-(0.8 * -R1FInRv + ∆Rv) *
tan (ArgLd)
0.0
0.0
If OperationLdCh = Off
(0.8 * -R1FInRv + ∆Rv) *
tan (ArgLd)
0.8 * X1InFw