Reassemble Unit; Vertical Column Cable Tension - GE AMX-4+ Technical Manual

Hide thumbs Also See for AMX-4+:
Table of Contents

Advertisement

GE MEDICAL SYSTEMS
REV 5
Note:
4 3 3

Reassemble Unit

4 3 4

Vertical Column Cable Tension

TABLE 4-1
VERTICAL COLUMN TENSION
COLUMN ATTITUDE
COLUMN ATTITUDE
HORIZONTAL
VERTICAL
N/A – Not applicable; value not measured
8. Remove old safety cable from column.
9. Push new safety cable stud end through top of column over top of upper pulley.
10. Push ball end into counterweight slot.
11. Install cable retainer clip.
12. Install trim weights.
13. Thread new safety cable through back of carriage.
14. Raise vertical arm to comfortable working height.
15. Apply Loctite to threads of cable stud. Install jam nut on cable stud.
16. Install cable stud through carriage horizontal strut and install holding nut.
17. Set cable tension in accordance with Section 4 3 4. Tighten cable jam nut.
Do not allow cables to twist while setting tension.
1. Replace carriage access plate and four binding head screws.
2. Install column cap.
3. Move horizontal arm through full range of motion, ensuring that it moves
smoothly with equal force throughout its range. Ensure that both cables run
smoothly through upper pulley.
Tension in the vertical column cables can be measured two ways: when the column is
horizontal (as when replacing the counterweight) or vertical (as when replacing the
main and safety cables). Table 4-1 lists the tension values required for the different
attitudes.
MAIN
60 LB (27 KG)
N/A
4-7
(MODEL 2169360, 2236420 & 2275938 SERIES)
DIRECTION 2173225-100
CABLE TENSION
SAFETY
5–10 LB (2.3–4.5 KG)
N/A
AMX-4+ SERVICE
FOLLOWER
N/A
10–15 LB (4.5–6.8 KG)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2169360 series2236420 series2275938 series

Table of Contents