Mounting; Ventilation - GE ApexPro Service Manual

Telemetry server
Hide thumbs Also See for ApexPro:
Table of Contents

Advertisement

Mounting

Ventilation

Revision C
Installation: Installation Requirements
The ATS should be mounted in accordance with the site's design documentation and
site survey results.
&$87,21
LOSS OF MONITORING — Mount the ApexPro Telemetry
Server securely and away from vibration. Vibration may cause
patient waveform dropout at the CIC Pro.
The ApexPro Telemetry Server can be installed free-standing, in a component rack,
or in a wall bracket. The rack must be installed in a location providing proper
environmental, ventilation, power, grounding, EMI/RF, and network requirements.
&$87,21
EQUIPMENT FAILURE — Do NOT locate the ApexPro
Telemetry Server in an enclosed area that may restrict dissipation
of generated heat. The ApexPro Telemetry Server uses an internal
forced air cooling system. Any air flow restrictions may cause a
rise in internal temperature which may result in equipment failure.
The ApexPro Telemetry Server is capable of producing heat and must be physically
located to allow for ample air circulation to properly dissipate the heat.
Keep ApexPro Telemetry Server ventilation openings free of obstructions. The
ApexPro Telemetry Server rack installation location should provide at least the
following minimal clearances for ventilation and access.
In Front
15.5 centimeters (6 inches)
In Back
15.5 centimeters (6 inches)
ApexPro Telemetry Server
2001989-178
3-5