Download Print this page

Husqvarna DXR 145 Operator's Manual page 86

Hide thumbs Also See for DXR 145:

Advertisement

5. Remove the left side cover (A).
6. Turn the lock knob counterclockwise (B).
7. Turn the valve for caterpillar track tension (C)
counterclockwise to the end position to open the
valve. This releases the pressure.
8. Do the procedure that follows on each side of the
product.
a) Push the tension wheel to the center.
b) Remove the caterpillar tracks.
c) Install new caterpillar tracks.
9. Turn the valve for caterpillar track tension clockwise
to close the valve.
10. Turn the lock knob clockwise.
11. Install the left side cover.
86
A
B
C
12. Start the product and do automatic caterpillar track
To do automatic caterpillar track
tension. Refer to
tension on page 87 .
To remove and install the caterpillar tracks
(DXR 275, DXR 305, DXR 315)
1. Start the product. Refer to
275, DXR 305, DXR 315) on page 53 .
2. Park the product on level ground.
3. Fully extend the outriggers. Refer to
outriggers on page 61 .
4. Stop the product. Refer to
275, DXR 305, DXR 315) on page 62 .
5. Remove the inspection cover (A).
6. Pull out and turn the valve for caterpillar track
tension ¼ turn counterclockwise to lock it in an open
position (B) and (C). This releases the pressure.
7. Do the procedure that follows on each side of the
product.
a) Push the tension wheel to the center.
To start the product (DXR
To operate the
To stop the product (DXR
A
B
C
1401 - 002 - 15.10.2021

Advertisement

loading

This manual is also suitable for:

Dxr 275Dxr 305Dxr 315