1. 48 V system connector
3.
At each cutting unit lift arm, remove the snapper
pin that secures the cap to the pivot yoke, and
remove the cap
1. Snapper pin
Preparing the Cutting Units
1.
Remove the cutting units from the cartons.
2.
Assemble and adjust as described in the cutting
unit Operator's Manual.
3.
Make sure that the counterweight
installed at the proper end of the cutting unit as
described in the cutting unit Operator's Manual.
Figure 5
2. Battery-disconnect jumper
(Figure
6).
Figure 6
2. Cap
(Figure
g375232
1. Counterweight
4.
Coat the carrier-frame shaft with clean grease
(Figure
g003975
1. Carrier-frame shaft
5.
Repeat steps
units.
7) is
13
Figure 7
8).
Figure 8
1
through
4
for the other cutting
g027133
g375263