Chapter 5 - Mechanical Installation; Safety; Overview On Installation Work; General Notes On Installation - ABB ACS5000 User Manual

Medium voltage ac drive air-cooled, 2 - 7 mva
Hide thumbs Also See for ACS5000:
Table of Contents

Advertisement

ABB

Chapter 5 - Mechanical installation

5.1

Safety

5.2

Overview on installation work

5.3

General notes on installation

5.3.1

Dimensions, clearances

5.3.2

Cabinet roof

5.3.3

Fire protection

5k A UM
All installation work must be carried out by qualified personnel according
to the site and equipment requirements and in compliance with local
regulations.
The installation includes the following work:
Preparing the floor
Fixing the cabinet to the floor
Installing the fan units
NOTICE
Foreign matter and particularly metallic dust can cause failure and
damage when the drive is energized.
Ensure that foreign matter cannot enter the cabinet:
Close the doors and cover openings completely when work is
discontinued.
Retrieve any foreign matter which accidentally dropped into the
cabinet.
For information on cabinet dimensions, clearances to be observed and
fixing hole sizes, see
The cabinet roof is not designed as a mounting base for, eg, foreign
devices, cable ducts. Therefore, it is not permitted to install any foreign
device on the roof.
Suitable fire protection measures should be applied to prevent fire
spreading into the drive.
3BHS221906 ZAB E01 Rev. D
Appendix C – Mechanical
drawings.
5-1 (4)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents